West Virginia Residential Contractor Trade Exam Exam Prep
Free practice questions

Free WV-RC Practice Questions

10 exam-style questions with answers and explanations, straight from our 1,030-question bank. Tap an answer to check yourself. When you're ready, take the scored version in the free practice test.

Start the free practice test → ★★★★★4.9/5 from 2,400+ candidates · No signup

The WV-RC exam has 60 questions and runs 3 hours.

These 10 free WV-RC questions are organized by exam domain, so you can see how each part of the West Virginia Residential Contractor Trade Exam blueprint is tested. Reveal the answer and explanation under each question.

Domain 1: Plan Reading

Question 1

The latest approved floor plan was printed at 50% of its original size. A bearing-wall centerline is dimensioned 12 feet from Grid A, but measuring the reduced print with the unchanged printed scale gives 6 feet. No written dimensions conflict. The foreman should direct the layout crew to:

Show answer & explanation

Correct answer: A - Set the centerline 12 feet from Grid A, using the written dimension

Question 2

For a shingle takeoff, a rectangular house measures 40 feet by 28 feet at the exterior wall lines. Its simple gable roof has 1-foot horizontal overhangs on all four sides and a uniform 6:12 slope. Use a slope-area factor of 1.118 and add 10% for waste. Shingles are ordered in whole roofing squares, each covering 100 ft². With no openings deducted, how many squares should be ordered?

Show answer & explanation

Correct answer: C - 16 squares

Domain 2: Sitework

Question 3

A fill lift beneath a house slab must reach at least 95% of the laboratory maximum dry density, with moisture between 18% and 22% by dry mass. The laboratory maximum dry density is 115 lb/ft³. A valid field test reports wet density of 132 lb/ft³ and moisture content of 20% by dry mass. How does the tested lift compare with these two requirements?

Show answer & explanation

Correct answer: B - Accept it: relative compaction is approximately 96%, and moisture is acceptable

Domain 3: Concrete

Question 4

A new garage slab sheds fine gray powder when swept, although the concrete below the surface is sound. Placement records show that troweling began while bleed water remained on the slab. The slab did not freeze, and its specified curing was maintained. Which mechanism best explains the surface defect?

Show answer & explanation

Correct answer: D - Finishing incorporated bleed water and weakened the surface cement paste

Question 5

Before a footing pour, the inspector checks bottom reinforcement in concrete that will be cast directly against undisturbed earth. The footing sides are formed, and the reinforcing bars are No. 4. A crew member says the smaller bars permit the 1½-inch cover used for formed concrete exposed to weather. Which requirement governs the bottom bars?

Show answer & explanation

Correct answer: A - Provide 3 inches of clear cover because the bottom concrete is cast against earth

Domain 4: Masonry

Question 6

Water appears inside a brick-veneer wall after wind-driven rain. Opening the wall reveals intact flashing and open weeps, but hardened mortar bridges the cavity and contacts the backing at the wet locations. Exterior mortar joints are sound. Which repair addresses the demonstrated water path?

Show answer & explanation

Correct answer: B - Remove the mortar bridges and restore the clear drainage cavity

Question 7

A masonry chimney top is 3 feet 6 inches above the highest roof contact at its penetration and 2 feet 6 inches above a dormer ridge 8 feet away horizontally. That dormer is the highest building portion within 10 horizontal feet; a taller main ridge is 12 feet away. Considering only 2018 IRC termination heights, which assessment is correct?

Show answer & explanation

Correct answer: D - It passes; the penetration and 10-foot-radius clearance requirements are both satisfied

Domain 5: Carpentry

Question 8

An owner wants to open the ceiling beneath a conventionally framed gable roof. The roof has a ridge board, low rafter ties, and collar ties in the upper third of the attic. The proposal removes the low ties but leaves the collar ties. With no other structural changes, which function would be lost?

Show answer & explanation

Correct answer: C - Restraining the rafters from pushing the exterior walls outward

Question 9

A proposed bedroom escape window has a rectangular net-clear opening 22 inches wide by 36 inches high, with a net-clear area of 5.5 ft². The bottom of that opening is 40 inches above the finished floor and 9 feet above adjacent exterior grade. It opens without keys, tools, or special knowledge. Under the 2018 IRC, what prevents this opening from qualifying?

Show answer & explanation

Correct answer: D - The 5.5-square-foot net-clear area of the opening

Domain 8: Safety OSHA

Question 10

A competent person initially permits work in an unprotected trench 4 feet 6 inches deep after finding no indication of a potential cave-in. During the shift, a fresh crack opens behind the trench face and soil begins bulging inward while a worker is inside. What must happen immediately?

Show answer & explanation

Correct answer: A - Evacuate the trench; prevent reentry until necessary protective measures are in place

The rest of the WV-RC blueprint

The WV-RC exam also covers these domains. Drill them in the full free practice test:

That's 10 of 1,030

The full bank has 1,020 more WV-RC questions with explanations.

Continue in the free practice test →

View plans